Mini GPS Tracker – RealTime Location Device for Car, Asset & Personal Tracking
Mini GPS Tracker – RealTime Location Device for Car, Asset & Personal Tracking
Mini GPS Tracker – Smart Real-Time Locator for Kids, Pets, Vehicles & Valuables (Advanced Anti-Theft Device)
Product Overview
The Mini GPS Tracker is a compact, smart, and highly reliable tracking device designed to protect what matters most. Whether you want to ensure your child’s safety, track your pet, safeguard your vehicle, or monitor important belongings, this lightweight tracker delivers accurate real-time location updates, giving you complete peace of mind.
Built with an advanced tracking chip, powerful connectivity, and long battery life, this device is perfect for personal safety, anti-theft protection, and daily monitoring.
⭐ Key Features
1. Real-Time GPS Location Tracking
Stay updated every second.
The tracker provides live location monitoring through a mobile app, helping you see exactly where your child, pet, vehicle, or bag is at any moment.
2. Mini, Slim & Lightweight Design
Smaller than a matchbox.
Slip it inside:
school bags
handbags
pet collars
wallets
cars or bikes
luggage
Its discreet design makes it almost invisible.
3. Anti-Lost & Geo-Fencing Alerts
Set a “safe zone” for children, pets, and vehicles.
If the tracker moves outside this zone, you instantly receive an alert on your phone.
Perfect for preventing:
Kid wandering
Pet running away
Vehicle theft
Bag or luggage loss
4. Strong Magnetic Base
Attaches firmly to any metal surface.
Ideal for cars, motorcycles, cycles, lockers, and delivery boxes.
Once attached, it stays hidden and secure.
5. Long Battery Life
Designed for extended use with efficient power consumption.
Ideal for long trips, daily school use, and continuous tracking.
6. Intelligent Tracking History
View the tracker’s location history for the entire day.
Perfect for parents and business owners who want to monitor movements or check travel routes.
7. Multiple Tracking Modes
You can switch modes depending on your use:
Real-Time Mode: Instant updates
Interval Mode: Battery-saving updates
Sleep Mode: Long standby time
🎯 Recommended Uses
For Kids
Track school routes, tuition travel, or outdoor activities. Stay worry-free.
For Pets
Never lose your cat or dog again. Attach the tracker to the collar and monitor them anytime.
For Vehicles
Protect your car, bike, rickshaw, or delivery vehicle from theft.
For Bags & Luggage
Perfect for travelers who want to monitor suitcases and handbags.
For Business Owners
Track delivery bikes, employees, assets, and equipment.
📦 Package Includes
1 × Mini GPS Tracker
1 × Charging Cable
1 × User Manual
🚀 How to Use
Fully charge the device.
Install the tracking app (instructions included).
Pair the tracker with the app.
Place or attach the device to your child, pet, or vehicle.
Open the app anytime to see the live location.
❤️ Why Customers Love It
Extremely accurate location tracking
Tiny and easy to hide
Saves kids & pets from getting lost
Prevents car and bike theft
Ideal for traveling and daily use
Works anywhere in Pakistan
📦 Delivery Details
Delivery Time: 1–3 days across Pakistan
Customer Support: Available 24/7
our customerS loves this ❤️
Ali Raza
Peace of Mind for My Car
I attached this tiny tracker under my car using a magnet, now I can track its exact location in real-time. Super useful, especially when parking in busy areas.
View Product →
Zainab Ahmad
Perfect for Tracking My Teen
I put this tracker in my son’s school bag so I can make sure he reaches home safely. The GPS works very accurately and I get notifications when he moves.
View Product →
Usman Khalid
Great for My Delivery Business
I bought this for my bike in my delivery business. Helps me monitor bike locations, and I can also check historical routes. Very helpful for managing my vehicles.
View Product →
Fatima Naz
Very Compact & Discreet
It’s so small I almost forgot I installed it! But the tracking is very solid, and the battery lasts long. Definitely a good buy.
View Product →
Aisha Qureshi
Helps Me Track My Luggage
Used this tracker for my suitcase when I travelled. Kept an eye on its location the whole time, very reliable and lightweight.
View Product →
